Civil Engineering - Highway Engineering - Discussion
Discussion Forum : Highway Engineering - Section 2 (Q.No. 16)
16.
To indicate proper control of consistency of a freshly mixed concrete for pavement construction, the slump should be between
Discussion:
15 comments Page 1 of 2.
Satish said:
6 years ago
Answer is A.
A Slump is between 20-40 mm for road or pavement construction.
A Slump is between 20-40 mm for road or pavement construction.
(2)
Mahesh sinh said:
5 years ago
Option A is correct for pavement concrete.
(2)
Pankaj yadav said:
7 years ago
For the road, slump should be 30 to 50.
But in this question, freshly mixed concrete should be 50 to 70 mm.
But in this question, freshly mixed concrete should be 50 to 70 mm.
(1)
Shekhar said:
8 years ago
I think the answer is A.
Mahesh sinh said:
8 years ago
According to Khurmi, the range is between 5 to 7 cm so C is right option.
Abhijeet said:
8 years ago
Answer D is right.
Slump nearly equals to 7.5 cm.
Slump nearly equals to 7.5 cm.
Garry said:
8 years ago
@Shekhar.
A is correct.
A is correct.
Susnata said:
8 years ago
I think A is correct.
Lkjha said:
8 years ago
Slump Specified as 25 mm (1.0 inch). This is typical for pavement PCC. Ans 1 is correct.
Epcet amit said:
7 years ago
The slump value of pavement construction is 20 to 40 mm. So from the above option A is correct.
Post your comments here:
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers