Civil Engineering - Highway Engineering - Discussion

Discussion Forum : Highway Engineering - Section 2 (Q.No. 16)
16.
To indicate proper control of consistency of a freshly mixed concrete for pavement construction, the slump should be between
3 to 5 cm
4 to 6 cm
5 to 7 cm
7 to 10 cm
10 to 12 cm
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
15 comments Page 2 of 2.

Susnata said:   8 years ago
I think A is correct.

Garry said:   8 years ago
@Shekhar.

A is correct.

Abhijeet said:   8 years ago
Answer D is right.

Slump nearly equals to 7.5 cm.

Shekhar said:   8 years ago
I think the answer is A.

Mahesh sinh said:   8 years ago
According to Khurmi, the range is between 5 to 7 cm so C is right option.