Civil Engineering - Highway Engineering
Exercise : Highway Engineering - Section 6
1.
Gradient resistance of moving vehicles along down slopes, is
2.
Thickness of broken centre line markings for a four lane road, is generally kept
3.
Maximum number of vehicles that can pass a given point on a lane during one hour without creating unreasonable delay, is known as
4.
The desirable camber for straight roads with water bound macadam or gravel surface, is
5.
In case of a hair pin bend of a highway,
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers