4.
The desirable camber for straight roads with water bound macadam or gravel surface, is
Discussion:
5 comments Page 1 of 1.
Santosh Bhatta said:
2 years ago
5% -> Earthen Road.
4% -> Gravel Road.
2.5% -> Bituminous Road.
1.5-2% -> Concrete Road.
4% -> Gravel Road.
2.5% -> Bituminous Road.
1.5-2% -> Concrete Road.
Suraj Chaurasiya said:
5 years ago
2 percent for cement concrete.
2.5 percent for bitumen surface.
3 percent for W.B.M road.
4 percent for earthen road.
2.5 percent for bitumen surface.
3 percent for W.B.M road.
4 percent for earthen road.
Shubham Kumar said:
7 years ago
Thanks for the explanation.
Amit g said:
8 years ago
Thanks @Prakash.
Prakash said:
9 years ago
1 in 160 to 1 in 140 = For concrete pavement road.
1 in 150 to 1 in 140 = For bitumen pavement road.
1 in 40 to 1 in 33 = For water bound macadam pavement road.
1 in 150 to 1 in 140 = For bitumen pavement road.
1 in 40 to 1 in 33 = For water bound macadam pavement road.