Civil Engineering - Estimating and Costing - Discussion
Discussion Forum : Estimating and Costing - Section 1 (Q.No. 1)
1.
Pick up the excavation where measurements are made in square metres for payment.
Discussion:
22 comments Page 3 of 3.
Arjun acharya said:
4 years ago
I think option 1 is also right.
Vaxoo said:
3 years ago
Surface dressing is by default measured in m2.
For excavation of width>1.5m and depth<30cm measured in m2.
For excavation of width>1.5m and depth<30cm measured in m2.
(2)
Post your comments here:
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers