37.
The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is
Rs. 400
Rs. 425
Rs. 450
Rs. 500
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
13 comments Page 1 of 2.

Rashad said:   10 years ago
Size = 0.4*0.05 = 0.2.

Length = 5 meters.

= 0.2*5*450 = 450.

C is the right answer.

KIRAN POOLA said:   10 years ago
0.4*0.5 = 0.2.
L = 5 m
= 5*0.2*450 = 450.

Rajnish said:   10 years ago
It ask for cutting not total.

Ranjitha said:   9 years ago
@Rajnish

The length of drain = 5m.

Width of drain as per figure = 0.5m.
Depth of drain as per figure = 0.4m.

Total qty = 5 * 0.5 * 0.4 = 1 cum.

As per the question, cum excavation rate is 450%.

So the total cost required for excavation of drain is = 1 * 450 = Rs.450.

Therefore, the answer is C.
(2)

Usha said:   9 years ago
@Ranjitha is correct.

M.Rashid said:   9 years ago
C is the right answer. I agree.

Pratap said:   9 years ago
I think that Rs. 450 is given for per 100 cum.

Which means its Rs. 4.5 per cum.

Rahul kushwaha said:   8 years ago
5*0.5*0.4=1cum at 450 = Rs.450 is right. So the answer is C.

Notin said:   8 years ago
Out of the quantities of various item earthwork in an excavation in the foundation, PCC works in the foundation with 1:4:8 proportion, bricks work 1:6 foundation and plinth, damp proof course 2.5 cm thick, plastering 1.6 both side of wall and plinth wall.

Sitaam said:   8 years ago
5*.5 *.4 = 1 * 450 = 450 answer.