The expected out turn of half brick partition wall per mason per day is
1.5 m3
2.0 m3
4.0 m2
5.0 m2
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
50 comments Page 5 of 5.

Ankesh singh said:   7 years ago
5 cu m is the correct answer.

Shubham said:   7 years ago
The answer should be 5sqm.

Abhishek Kumar said:   7 years ago
The Correct Answer is 5 sq metre.

Ref: B.N.Dutta Estimating and Costing.

Aksh said:   7 years ago
The Answer is 5m^2.

Ankit said:   7 years ago
Explain the correct answer.

Yuvi said:   6 years ago
Mason work per day concrete work = 5 m^3.
Earth excavation or earthwork = 3 m^3.
Brick work = 2 m^3.

Indra sirpal said:   6 years ago
Why not C? please tell me.

Roushan kumar said:   6 years ago
Answer D is correct. Calculate in meter square not in meter cube.

Anjali said:   6 years ago
5 m2 is the correct one.

Karmvir Yadav said:   1 decade ago
Answer D is correct because half brick work is measured in square meter not in m3.