Civil Engineering - Estimating and Costing
Exercise : Estimating and Costing - Section 2
- Estimating and Costing - Section 1
- Estimating and Costing - Section 2
16.
Pick up the correct statement from the following:
17.
The expected out turn of half brick partition wall per mason per day is
18.
If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is
19.
The floor area includes the area of the balcony up to
20.
The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is


Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers