Civil Engineering - Estimating and Costing

Exercise : Estimating and Costing - Section 2
16.
Pick up the correct statement from the following:
Pointing is measured in sq.m
Plastering is measured in sq.m
Glazing is measured in sq.m
Striking is measured in sq.m
All the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

17.
The expected out turn of half brick partition wall per mason per day is
1.5 m3
2.0 m3
4.0 m2
5.0 m2
Answer: Option
Explanation:
No answer description is available. Let's discuss.

18.
If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is
B + d + Sd
Bd + Sd2
B x d - Sd1/2
(Bd + Sd2)
Answer: Option
Explanation:
No answer description is available. Let's discuss.

19.
The floor area includes the area of the balcony up to
100%
75%
50%
25%
Answer: Option
Explanation:
No answer description is available. Let's discuss.

20.
The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is
Answer: Option
Explanation:
No answer description is available. Let's discuss.