17.
The expected out turn of half brick partition wall per mason per day is
Discussion:
50 comments Page 3 of 5.
Baloch said:
4 years ago
Halfbrick work is Calculated in Squire meter. the value of option B is in cubic meter.
So, the answer is option D.
Reference R.Agor.
So, the answer is option D.
Reference R.Agor.
Aman said:
4 years ago
5m2 is the correct answer.
Jagat Khadka said:
3 years ago
5m^2 is the Correct Answer.
Narendra said:
3 years ago
Half brick work is in sq.m.
James said:
2 years ago
I think the correct answer, is option (d).
Uttam Khanra said:
2 years ago
First, Half bricks partition wall will be in m2. It will be 7.5m2.
RANJEET KUMAR said:
8 years ago
I think D is the correct answer.
Alvin said:
9 years ago
Absolutely, the answer should be in m2.
RaviG said:
9 years ago
In MCQ books the answer is 5.0 sq m.
Which is correct? Please tell.
Which is correct? Please tell.
Prashant said:
9 years ago
It should be 5 sqm.