21. 

The plinth area of a building not includes

A. area of the walls at the floor level
B. area of stair cover
C. internal shaft for sanitary installations up to 2 sq m. in area
D. lift and wall including landing
E. area of cantilevered porch.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

22. 

For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is

A. 0.200 m3
B. 0.247 m3
C. 0.274 m3
D. 0.295 m3

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

23. 

The minimum width of a septic tank is taken

A. 70 cm
B. 75 cm
C. 80 cm
D. 90 cm

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

24. 

The item of the brick structure measured in sq.m, is

A. Reinforced brick work
B. Broken glass coping
C. Brick edging
D. Brick work in arches.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

25. 

The inspection pit or chamber is a manhole provided in a base drainage system

A. at every change of direction
B. at every change of gradient
C. at every 30 m intervals
D. at the point where vertical soil pipe joins the house drain
E. All the above.

Answer: Option E