Civil Engineering - Concrete Technology - Discussion

Discussion Forum : Concrete Technology - Section 3 (Q.No. 23)
23.
If the effective working time is 7 hours and per batch time of concrete is 3 minutes, the output of a concrete mixer of 150 litre capacity, is
15, 900 litres
16, 900 litres
17, 900 litres
18, 900 litres
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
20 comments Page 1 of 2.

Samuel said:   1 decade ago
Effective working time = 420 minutes (7 hours).

Batching time = 3 minutes.

No : of batching = 420/3 = 140.

Output concrete for 1 batching = 150 liters.

For 140 batching = 150*140 = 21000 liters. (This is the actual value).

But I think here they consider the efficiency of the batch plant as 90%.

= 21000*90/100 = 18900 liters.

Shrikant Datey said:   6 years ago
Effective working time = 420 minutes (7 hours).
Batching time = 3 minutes.
No : of batching = 420/3 = 140.
Output concrete for 1 batching = 150 liters.
For 140 batching = 150*140 = 21000 liters. (This is the actual value).
But I think here they consider the efficiency of the batch plant as 90%.

= 21000 * 90/100 = 18900 liters.
(10)

Mr. Jena said:   6 years ago
Effective working time = 420 minutes (7 hours).

Batching time = 3 minutes.
No : of batching = 420/3 = 140.
Output concrete for 1 batching = 150 liters.
For 140 batching = 150*140 = 21000 liters. (This is the actual value).
But I think here they consider the efficiency of the batch plant as 90%.
= 21000*90/100 = 18900 liters.
(4)

Amit said:   1 decade ago
Effective working time= 7 hours = 7*60 = 420 minute.

Per batch time = 3 minute.
Number of mixing batch = 420/3 = 140.

Output concrete of per batch = 150 litre.
Output concrete 140 batch = 140*150 = 21000 litre.

Assuming the efficiency = 90%.
21000* 0.9 = 18900.

MOHD PARVEZ said:   1 decade ago
Effective working time= 7 hours = 7*60 = 420 minute.

Per batch time = 3 minute.

Number of mixing batch = 420/3 = 140.
Output concrete of per batch = 150 litre.
Output concrete 140 batch = 140*150 = 21000 litre.

Lokesh said:   1 decade ago
@Jay shah in construction industry efficiency will be assigned according to condition of equipment. Mostly for time concern and making fruitful profits 90% will be considered.

Dorna said:   4 years ago
The minimum mixing time is 2 minutes and why the value 3 is min batching is mandatory? Please explain me.

Rakesh dev said:   4 years ago
(7* 60)/3 = 140.
140 * 150 = 21000ltr.
90% efficiency.
(21000 * 90)/100 = 18,900ltr.
(10)

Saka laka said:   8 years ago
Because out of 3 min, 30 sec is considered as Material filing and water filling.
(1)

Ajay k said:   9 years ago
Is there any thumb rule for the efficiency of the concrete mixer?