Civil Engineering - Concrete Technology - Discussion
Discussion Forum : Concrete Technology - Section 2 (Q.No. 25)
25.
C.R.R.I. charts are used to obtain a relatioship between strength of concrete and
Discussion:
11 comments Page 1 of 2.
Mrinmoy Sarma said:
7 years ago
C.R.R.I only works on road and road materials. So, I don't think C.R.R.I has provided any kind of relationship between the strength of concrete and water-cement ratio. Atleast i haven't found anything like this on the internet.
Pakkirappa said:
8 years ago
1) The span to depth ratio for a cantilever of the beam should not exceed 7.
2) Also, the maximum size of cantilever provided should be 10m.
3) i.e length of the cantilever should not be more than 10 meters.
2) Also, the maximum size of cantilever provided should be 10m.
3) i.e length of the cantilever should not be more than 10 meters.
Debojyoti Roy said:
8 years ago
Maximum length of cantilever beam is 1.2 metres from fixed end.
Akash singh said:
9 years ago
@Dheeraj Kumar.
C.R.R.I -> Central Road Research Institute.
C.R.R.I -> Central Road Research Institute.
Nikhil said:
1 decade ago
Full form of CRRI is central road research institute.
Maitri chavan said:
5 years ago
What are the various relationships given by CRRI?
Alok said:
1 decade ago
Max length for cantilever beam please tell.
Manoj said:
9 years ago
C.R.R.I - Central Road Research Institute.
Ramesh Talwar said:
7 years ago
C R R I - Central Road Research Institute.
(1)
DHEERAJ KUMAR said:
1 decade ago
What is the full form of C.R.R.I?
Post your comments here:
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers