Civil Engineering - Concrete Technology - Discussion

25. 

C.R.R.I. charts are used to obtain a relatioship between strength of concrete and

[A]. water cement ratio
[B]. workability
[C]. grading of aggregate
[D]. fineness modulus
[E]. none of these.

Answer: Option A

Explanation:

No answer description available for this question.

Dheeraj Kumar said: (Sep 3, 2014)  
What is the full form of C.R.R.I?

Nikhil said: (Oct 8, 2014)  
Full form of CRRI is central road research institute.

Alok said: (Nov 28, 2014)  
Max length for cantilever beam please tell.

Sumit said: (Feb 18, 2015)  
12m (max lent of cantilever).

Akash Singh said: (Aug 7, 2016)  
@Dheeraj Kumar.

C.R.R.I -> Central Road Research Institute.

Manoj said: (Oct 22, 2016)  
C.R.R.I - Central Road Research Institute.

Debojyoti Roy said: (May 15, 2017)  
Maximum length of cantilever beam is 1.2 metres from fixed end.

Pakkirappa said: (Sep 6, 2017)  
1) The span to depth ratio for a cantilever of the beam should not exceed 7.
2) Also, the maximum size of cantilever provided should be 10m.
3) i.e length of the cantilever should not be more than 10 meters.

Ramesh Talwar said: (Sep 2, 2018)  
C R R I - Central Road Research Institute.

Mrinmoy Sarma said: (Mar 2, 2019)  
C.R.R.I only works on road and road materials. So, I don't think C.R.R.I has provided any kind of relationship between the strength of concrete and water-cement ratio. Atleast i haven't found anything like this on the internet.