Civil Engineering - Concrete Technology - Discussion
Discussion Forum : Concrete Technology - Section 2 (Q.No. 25)
25.
C.R.R.I. charts are used to obtain a relatioship between strength of concrete and
Discussion:
11 comments Page 1 of 2.
Ramesh Talwar said:
7 years ago
C R R I - Central Road Research Institute.
(1)
DHEERAJ KUMAR said:
1 decade ago
What is the full form of C.R.R.I?
Nikhil said:
1 decade ago
Full form of CRRI is central road research institute.
Alok said:
1 decade ago
Max length for cantilever beam please tell.
Sumit said:
1 decade ago
12m (max lent of cantilever).
Akash singh said:
9 years ago
@Dheeraj Kumar.
C.R.R.I -> Central Road Research Institute.
C.R.R.I -> Central Road Research Institute.
Manoj said:
9 years ago
C.R.R.I - Central Road Research Institute.
Debojyoti Roy said:
8 years ago
Maximum length of cantilever beam is 1.2 metres from fixed end.
Pakkirappa said:
8 years ago
1) The span to depth ratio for a cantilever of the beam should not exceed 7.
2) Also, the maximum size of cantilever provided should be 10m.
3) i.e length of the cantilever should not be more than 10 meters.
2) Also, the maximum size of cantilever provided should be 10m.
3) i.e length of the cantilever should not be more than 10 meters.
Mrinmoy Sarma said:
7 years ago
C.R.R.I only works on road and road materials. So, I don't think C.R.R.I has provided any kind of relationship between the strength of concrete and water-cement ratio. Atleast i haven't found anything like this on the internet.
Post your comments here:
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers