2.
If 1500 g of water is required to have a cement paste 1875 g of normal consistency, the percentage of water is,
Discussion:
95 comments Page 2 of 10.
Sameer Khan said:
5 years ago
No it is wrong.
The % of Water= wt of cement/wt of water *100.
The % of Water= wt of cement/wt of water *100.
(3)
Deepak raj joshi said:
3 months ago
The question might mean:
If 1500 g of cement is required to have a cement paste 1875 g of normal consistency, the percentage of water is
So now:
Cement = 1500 g,
Cement paste = 1875 g,
Therefore, water = 1875 - 1500 = 375 g.
water% = water/cement * 100% = 375/1500 *100% =25% ans.
If 1500 g of cement is required to have a cement paste 1875 g of normal consistency, the percentage of water is
So now:
Cement = 1500 g,
Cement paste = 1875 g,
Therefore, water = 1875 - 1500 = 375 g.
water% = water/cement * 100% = 375/1500 *100% =25% ans.
(2)
B.Singh said:
4 years ago
You are right, thanks. @Mushtaq Ahmad.
(2)
Khemraj Regmi said:
1 decade ago
My question for the participants of this discussion forum is that where is the formula for the percentage water as weight of cement divided by weight of water?
I agree with Prof. P. Rajayogan. Thank you Prof. I have the long time confusion for this question. I am also thinking so but I am not getting single one to report this question like that.
I agree with Prof. P. Rajayogan. Thank you Prof. I have the long time confusion for this question. I am also thinking so but I am not getting single one to report this question like that.
(1)
Adam said:
8 years ago
Just imagine 1875 nos of fruit in a box 1500 apple and 375 oranges.
Obiously, percentage of apple is high => 1500/1875x100 = 80% and for oranges 375/1875x100 = 20%.
Similarly, water should be 80% and cement is 20%.
Obiously, percentage of apple is high => 1500/1875x100 = 80% and for oranges 375/1875x100 = 20%.
Similarly, water should be 80% and cement is 20%.
(1)
Farid Khan said:
6 years ago
If 1500 g of water is required to have a cement paste 1875 g of normal consistency, the percentage of water is,
According to the question.
Cement paste=1875.
Water=1500.
Cement =1875-1500=375.
Now if we want to know the percentage of cement then=(wt of cement/wt of water) *100
=375/1500*100=25%.
And if want to know the percentage of water then =wt of water/wt of cement *100
=1500/375*100 = 400%.
According to the question.
Cement paste=1875.
Water=1500.
Cement =1875-1500=375.
Now if we want to know the percentage of cement then=(wt of cement/wt of water) *100
=375/1500*100=25%.
And if want to know the percentage of water then =wt of water/wt of cement *100
=1500/375*100 = 400%.
(1)
Chethan said:
8 years ago
As per code, w/c ratio has not exceeded 1 so wt of water should be less than wt of cement.
Jack said:
9 years ago
% of water is not equal to (wt of water/wt of cement) x 100.
% of water = (wt of water/wt of cement paste) x 100.
= 1500/1875 x 100,
= 80%.
And hence the cement content must be 20%.
% of cement = (1875-1500)/1875 x 100 = 20%.
% of water = (wt of water/wt of cement paste) x 100.
= 1500/1875 x 100,
= 80%.
And hence the cement content must be 20%.
% of cement = (1875-1500)/1875 x 100 = 20%.
JANARDAN MONDAL said:
9 years ago
Percentage of water = (wt.of water/wt.of cement)100.
Question should be revised as follows:
If 375 ml or g of water is required to have a cement paste 1875 g of normal consistency, the percentage of water is,
Wt.of water = 1500 g.
Wt.of cement = 1875-1500 = 375 g.
Normal Consistency = (1500/375) * 100.
= 400%.
Question should be revised as follows:
If 375 ml or g of water is required to have a cement paste 1875 g of normal consistency, the percentage of water is,
Wt.of water = 1500 g.
Wt.of cement = 1875-1500 = 375 g.
Normal Consistency = (1500/375) * 100.
= 400%.
S r meena said:
9 years ago
1875 - 1500/1500 * 100 = 25%.