49.
To hydrate 500kg of cement full water needed, is
Discussion:
30 comments Page 3 of 3.
Agha Bilal said:
6 months ago
Thanks @Lalit chate.
The correct answer is indeed 130kg.
The correct answer is indeed 130kg.
Saifalikhan said:
8 years ago
25% for hyderation and 20% to fill gel pores.
Suresh said:
9 years ago
23% for hydration and 15% to fill gel pores.
(1)
Vineet said:
6 years ago
0.35*0.38 = 0.133.
0.133 * 1000 = 133kg.
0.133 * 1000 = 133kg.
Minesh said:
8 years ago
25% water need to full hydrate of cement.
Ajay Kumar Yadav said:
5 years ago
We have, w/c=0.26.
W= 0.26 *500 = 130.
W= 0.26 *500 = 130.
(2)
Chandan Kumar said:
4 years ago
500kg * 38% = 190kg water is required.
(2)
Lalit chate said:
3 years ago
500× (26÷100) =130 kg.
As per IS 456.
As per IS 456.
(8)
Ihsanullah said:
7 years ago
Water required from 26 to 35 percent.
Shahbaz said:
7 years ago
Thanks for the answer @Jayrasinhi.