To hydrate 500kg of cement full water needed, is
Discussion:
30 comments Page 2 of 3.
Lund chut said:
5 years ago
@ Rahul Rana.
For hydration, it needs 23 per cent for hydration and 15 per cent for filling gel space.
For hydration, it needs 23 per cent for hydration and 15 per cent for filling gel space.
(2)
Lund chut said:
5 years ago
@Rahul Rana.
For hydration, it needs 23 per cent for hydration and 15 per cent for filling gel space.
For hydration, it needs 23 per cent for hydration and 15 per cent for filling gel space.
(3)
Soumya said:
5 years ago
For hydration of cement 23% of water is required.
So, for 500 kg cement, the answer should be 115kg.
So, for 500 kg cement, the answer should be 115kg.
Amar Deep Tiwari said:
1 decade ago
% wt of water required for full hydration is 26% by wt of cement.
i.e., 26*500/100 = 130 kg.
i.e., 26*500/100 = 130 kg.
Gurjant Singh sawna said:
5 years ago
For complete hydration, 38% water is needed.
So 500*38/100 = 190 then how the answer is 130?
So 500*38/100 = 190 then how the answer is 130?
Aravind gottumukkala said:
1 decade ago
% wt of water required for full hydration is 38% by wt of cement.
i.e., 38*150/100 = 57 kg.
i.e., 38*150/100 = 57 kg.
Vijay said:
8 years ago
23+15=bound water +gel water = full hydration=0.38.
So w/c=0.38=w/500 so w=500 * 0.38=190.
So w/c=0.38=w/500 so w=500 * 0.38=190.
Sudhansu bhagat said:
9 years ago
24%for Hydration of cement + 15% Jel of water.
So 24 * 500 :- 120liter.
So 24 * 500 :- 120liter.
Apcivilian said:
9 years ago
For chemical reaction 23% water needed.
For complete reaction it is 38%.
For complete reaction it is 38%.
(1)
Swapnil pokulwar said:
9 years ago
For 50kg cement, 35 kg water is needed.
So, for 500kg its 135 = 130kg.