Civil Engineering - Concrete Technology - Discussion

Discussion Forum : Concrete Technology - Section 3 (Q.No. 49)
49.
To hydrate 500kg of cement full water needed, is
100 kg
110 kg
120 kg
130 kg
140 kg
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
30 comments Page 1 of 3.

Aravind gottumukkala said:   1 decade ago
% wt of water required for full hydration is 38% by wt of cement.

i.e., 38*150/100 = 57 kg.

Amar Deep Tiwari said:   1 decade ago
% wt of water required for full hydration is 26% by wt of cement.

i.e., 26*500/100 = 130 kg.

Soumya choudhury said:   1 decade ago
Actually it is 25% of corresponding water of cement.

So 500*0.25 = 125 kg. But according to option given answer will be 130 kg.

Sudhansu bhagat said:   9 years ago
24%for Hydration of cement + 15% Jel of water.

So 24 * 500 :- 120liter.

Nazira said:   9 years ago
For complete reaction, 38% of water by weight of cement is required.
0.38 * 500 = 190 kg.

But the answer given in this option is 130kg.

How?Can anybody explain?

Swapnil pokulwar said:   9 years ago
For 50kg cement, 35 kg water is needed.

So, for 500kg its 135 = 130kg.

Apcivilian said:   9 years ago
For chemical reaction 23% water needed.
For complete reaction it is 38%.
(1)

Suresh said:   9 years ago
23% for hydration and 15% to fill gel pores.
(1)

Saifalikhan said:   8 years ago
25% for hyderation and 20% to fill gel pores.

Vijay said:   8 years ago
23+15=bound water +gel water = full hydration=0.38.
So w/c=0.38=w/500 so w=500 * 0.38=190.