Mechanical Engineering - Industrial Engineering and Production Management - Discussion
Discussion Forum : Industrial Engineering and Production Management - Section 1 (Q.No. 2)
2.
In time study, the rating factor is applied to determine
Discussion:
28 comments Page 2 of 3.
Vijay said:
8 years ago
The Correct answer is C.
Yogesh said:
8 years ago
I think C is the correct answer.
Rafi said:
8 years ago
Answer c is the correct agree@Aravind.
Arvind said:
8 years ago
Since rating factor is used to determine standard time and standard time is used to determine fixation of incentive rate " ultimately so (c) is the correct answer.
Ashu said:
8 years ago
It not asking about the rating factor it is asking why it is applied what is the outcome after applying so in my view, option C is correct.
SANJAY said:
9 years ago
Then, what is mean by fixation of incentive rate?
Lucky said:
9 years ago
Performance Rating can be defined as the procedure in which the time study engineer compares the performance of operator (s) under observation to the Normal Performance and determines a factor called Rating Factor. There are several systems of rating the performance of operator on a job.
So, option "D" is perfect.
So, option "D" is perfect.
Viral said:
9 years ago
The right answer is D.
Manoj said:
9 years ago
I agree and the option D is right.
Sai said:
9 years ago
I think answer is the normal time of a work.
Post your comments here:
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers