31.
The time taken by a trained worker to perform an operation, while working a steady pace, is known as
32.
Normal time is the ratio of representative time to the rating factor.
33.
According to Muther, the basic principle of best layout is
34.
Time study is carried out to determine the time required to complete job by
35.
Slack may be positive, zero or negative.