Civil Engineering - Water Supply Engineering - Discussion
Discussion Forum : Water Supply Engineering - Section 6 (Q.No. 11)
11.
Asbestos pipes are joined by means of
Discussion:
2 comments Page 1 of 1.
Anirban Roy said:
5 years ago
Flanged joint--> at locations of huge pressure near water supply plant.
Flexible joint--> at the location of temperature stresses to allow expansion and contraction and flexure.
Dresser Coupling joint-> used for CI or steel pipes with plain ends. Can be both rigid and flexible.
Simplex Joint-> for the asbestos pipe.
Socket and spigot-> for ended pipes with different dia for CI pipes.
Flexible joint--> at the location of temperature stresses to allow expansion and contraction and flexure.
Dresser Coupling joint-> used for CI or steel pipes with plain ends. Can be both rigid and flexible.
Simplex Joint-> for the asbestos pipe.
Socket and spigot-> for ended pipes with different dia for CI pipes.
(6)
Bhatt said:
7 years ago
I think C is correct.
Post your comments here:
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers