Civil Engineering - Water Supply Engineering
Exercise : Water Supply Engineering - Section 6
11.
Asbestos pipes are joined by means of
12.
Abyssinian tube well is a special type of
13.
Chlorination of water does not remove
14.
The efficiency of a pumping set, is generally assumed
15.
To remove very fine suspended particles from water, the method adopted is
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers