Civil Engineering - Water Supply Engineering
Exercise : Water Supply Engineering - Section 1
26.
Manholes along the mains from the source to a city are provided at 500 m intervals in
27.
The population growth curve is
28.
Turbidity of raw water is a measure of
29.
If V is total consumption of water in litres for a population of N individuals, per capita consumption or water allowance for the water supply Q, is given by
30.
Water supply includes
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers