24.
At the junction of sewers
Discussion:
16 comments Page 1 of 2.
Utkarsh said:
5 years ago
C should be the correct option because, during backflow of large sewer, the small sewer can be prevented.
Sulaiman Khan said:
4 years ago
D is correct, different dia of pipes can be joined together only with manhole.
HAR said:
8 years ago
At the junction of sewers BOTTOM of larger sewer is kept lower.
Hisham said:
6 years ago
Crown matching done to avoid back flow from larger to smaller.
(1)
Basu said:
7 years ago
Top of sewage is at the same level option C is correct.
Anirban said:
6 years ago
Yes C is correct as crowns are kept at the same level.
MJM said:
4 years ago
C is the correct answer. Please correct it.
Thanks.
Thanks.
AJAY said:
7 years ago
A is the correct option I think.
Amjad Ali said:
6 years ago
Not D. C is the correct answer.
Dipu bunku rose said:
6 years ago
@ Hisham is correct. Thanks.