21. 

Lead caulked joints are used for laying

A. stone ware pipes
B. earthern ware pipes
C. C.I. pipes
D. G.I. pipes.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

22. 

Pick up the correct statement from the following :

A. The water supply pipes carry pure water free from solid particles
B. The water supply pipes get clogged if flow velocity is less than self cleansing velocity
C. The sewers may be carried up and down the hills and valleys
D. The sewer pipes are generally laid along level hills
E. None of these.

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

23. 

For trunk sewers more than 1.25 m in diameter, the ratio of the maximum daily sewage flow to the average daily sewage flow is assumed

A. 1.5
B. 2.0
C. 2.5
D. 3.0
E. 3.5

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

24. 

At the junction of sewers

A. top of smaller sewer is kept lower
B. top of larger sewer is kept lower
C. tops of both the sewers are at the same level
D. none of these.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

25. 

Primary treatment of sewage consists of removal of

A. large suspended organic solids
B. oil and grease
C. sand and girt
D. floating materials
E. none of these.

Answer: Option A

Explanation: