48.
You are asked to design sewer pipes of diameters 0.4 m to 0.9 m at maximum flow, you will assume the sewer flow running at
Discussion:
14 comments Page 2 of 2.
ER NK said:
5 years ago
It's 2/3rd.
Thanks for the explanation @Deepak G S.
Thanks for the explanation @Deepak G S.
Pravin said:
4 years ago
2/3rd is the correct answer.
Anirban Roy said:
3 years ago
If dia < 0.4m then 1/2 full.
0.4m < dia <0.9m then 2/3 full.
dia > 0.9m then 3/4 full.
0.4m < dia <0.9m then 2/3 full.
dia > 0.9m then 3/4 full.
MONU said:
3 years ago
Yes, it's 2/3rd of full maximum discharge.