Civil Engineering - Surveying - Discussion
Discussion Forum : Surveying - Section 6 (Q.No. 45)
45.
In setting up a plane table at any station
Discussion:
20 comments Page 1 of 2.
Farooq said:
7 years ago
Orientation and centering is done simultaneously. Leveling is done first.
Joshi said:
7 years ago
Levelling is done first and then centering then orientation.
Govinda sharma said:
7 years ago
Leveling is done first and then centerin after that orientation in case of plane table. In case of thedolit and leveling centering is done first and then leveling etc.
Basil said:
7 years ago
Centering is done first then levelling then orientation.
Aroon said:
7 years ago
Centering should done first.
Azay said:
6 years ago
Please explain the answer in detail.
Deep said:
6 years ago
Vending should be don first because if levelling is done first than centring levelling is also disturbed so first centring then levelling.
Namit Gurjar said:
6 years ago
The correct order is Levelling, centering then the orientation.
Laxman said:
6 years ago
Centering should be first then leveling.
Kishan said:
6 years ago
I have done the practices, centering first then leveling. Cause leveling is process involving rotation of screws it doesn't change the location of the instrument while centering is manual operation by moving tripod lags manually and its disturb leveling if already done.
Post your comments here: