Civil Engineering - Surveying
Exercise : Surveying - Section 5
36.
Number of subdivisions per metre length of a levelling staff is
37.
A lemniscate curve between the tangents will be transitional throughout if the polar deflection angle of its apex, is
38.
Pick up the wrong statement from the following :
39.
Prolongation of chain line across an obstruction in chain surveying, is done by
40.
Check lines (or proof lines) in Chain Surveying, are essentially required
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers