Civil Engineering - Surveying

36.
Number of subdivisions per metre length of a levelling staff is
100
200
500
1000
Answer: Option
Explanation:
No answer description is available. Let's discuss.

37.
A lemniscate curve between the tangents will be transitional throughout if the polar deflection angle of its apex, is
Answer: Option
Explanation:
No answer description is available. Let's discuss.

38.
Pick up the wrong statement from the following :
the diaphragm is placed between the eyepiece and the objective but nearer to the former
the diaphragm is placed between the eyepiece and the objective but nearer to the later
the outer component of the objective is a double-convex lens of crown glass
the inner component of the objective is a flint glass, convexo-concave
all the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

39.
Prolongation of chain line across an obstruction in chain surveying, is done by
making angular measurements
drawing perpendiculars with a chain
solution of triangles
all the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

40.
Check lines (or proof lines) in Chain Surveying, are essentially required
to plot the chain lines
to plot the offsets
to indicate the accuracy of the survey work
to increase the out-turn
Answer: Option
Explanation:
No answer description is available. Let's discuss.