Civil Engineering - Surveying
Exercise : Surveying - Section 5
46.
There are two stations A and B. Which of the following statements is correct :
47.
Chain surveying is well adopted for
48.
In a closed traverse, sum of south latitudes exceeds the sum of north latitudes and the sum of east departures exceeds the sum of west departures, then, the closing line will lie in
49.
A sewer is laid from a manhole A to a manhole B, 250 m away along a gradient of 1 in 125. If the reduced level of the invert at A is 205.75 m and the height of the boning rod is 3 m, the reduced level of the sight rail at B, is
50.
The Huygen's telescope eye piece
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers