Civil Engineering - Surveying
Exercise : Surveying - Section 5
41.
While measuring the distance between two points along upgrade with the help of a 20 m chain, the forward end of the chain is shifted forward through a distance
42.
Subtense tacheometry is generally preferred to if ground is
43.
For high sensivity of the bubble tube
44.
Short offsets are measured with
45.
The operation of revolving a plane table about its vertical axis so that all lines on the sheet become parallel to corresponding lines on the ground, is known
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers