Why should I learn to solve Civil Engineering questions and answers section on "Railways"?

Learn and practise solving Civil Engineering questions and answers section on "Railways" to enhance your skills so that you can clear interviews, competitive examinations, and various entrance tests (CAT, GATE, GRE, MAT, bank exams, railway exams, etc.) with full confidence.

Where can I get the Civil Engineering questions and answers section on "Railways"?

IndiaBIX provides you with numerous Civil Engineering questions and answers based on "Railways" along with fully solved examples and detailed explanations that will be easy to understand.

Where can I get the Civil Engineering section on "Railways" MCQ-type interview questions and answers (objective type, multiple choice)?

Here you can find multiple-choice Civil Engineering questions and answers based on "Railways" for your placement interviews and competitive exams. Objective-type and true-or-false-type questions are given too.

How do I download the Civil Engineering questions and answers section on "Railways" in PDF format?

You can download the Civil Engineering quiz questions and answers section on "Railways" as PDF files or eBooks.

How do I solve Civil Engineering quiz problems based on "Railways"?

You can easily solve Civil Engineering quiz problems based on "Railways" by practising the given exercises, including shortcuts and tricks.

Exercise : Railways - Section 1
1.
Mr. W. Simms, the consulting Engineer to the Government of India recommended the gauge for Indian railways
1.435 m as adopted in England
1.800 m as per Indian conditions
1.676 m as a compromise gauge
1.000 m as a standard gauge
Answer: Option
Explanation:
No answer description is available. Let's discuss.

2.
If absolute levels of rails at the consecutive axles A, B, and C separated by 1.8 metres are 100.505 m, 100.530 m, and 100.525 m respectively, the unevenness of rails, is
0.065 m
0.055 m
0.045 m
0.035 m
Answer: Option
Explanation:
No answer description is available. Let's discuss.

3.
A CST-9 sleeper consists of
two inverted triangular pots on either side of rail seat
a central plate with a projected key and box on the top of plate
a tie bar and 4 cotters to connect two cast iron plates
a single two way key provided on the gauge side to hold the rail to sleeper
all the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

4.
Charles Vignoles invented the flat footed rails in
1814
1836
1846
1856
1873
Answer: Option
Explanation:
No answer description is available. Let's discuss.

5.
To design a cross-over between parallel tracks, the required components are :
two switch, points, two acute angle crossings and two check rails
two switch points, two acute angle crossings and four check rails
two switch points, two acute angle crossings and six check rails
none of these.
Answer: Option
Explanation:
No answer description is available. Let's discuss.