Mahesh sinh said:
5 years ago
Option A is correct for pavement concrete.
(2)
Susheel kumar said:
4 years ago
Road pavement slump 20-40mm.
Ajay Sharma said:
4 years ago
I too agree, Option A correct.
Suraj said:
4 years ago
As per IS 456, it should be between 25 - 50 mm.
Sajjad Ali said:
10 months ago
Slump values for Road construction= 20 - 40 mm.
Piers,beams, column , parapet, walls Slabs = 40 mm - 50 mm.
Canal lining= 70 - 80mm.
RCC work = 50 - 150 mm.
Mass concrete= 25 mm - 50 mm.
Vibrated concrete= 10 - 25 mm
Piers,beams, column , parapet, walls Slabs = 40 mm - 50 mm.
Canal lining= 70 - 80mm.
RCC work = 50 - 150 mm.
Mass concrete= 25 mm - 50 mm.
Vibrated concrete= 10 - 25 mm