Civil Engineering - Highway Engineering

46. 

Bottom-most component of a flexible pavement, is

A. subgrade
B. sub-base
C. base
D. base course.

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

47. 

If V is the design speed in km/hour and R is the radius of the curve of a hill road, the super-elevation

A.
B.
C.
D.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

48. 

Pavement is said to be flexible if it contains

A. water bound macadam surface
B. stabilised soil base constructed of lime cement or tar
C. bitumen-bound stone layer of varying aggregates
D. lean concrete base
E. all the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

49. 

In ideal pavement is constructed with

A. bricks
B. hard soil
C. Portland cement concrete
D. tar
E. none of these.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.