Civil Engineering - Highway Engineering
Exercise : Highway Engineering - Section 3
41.
Parapet walls along hill roads, are provided
42.
From the point of tangency before an intersection, the route markers are fixed at a distance of
43.
A gradient along which the vehicle does not require any tractive effort to maintain a specified speed, is known as
44.
The traffic carrying capacity of a single lane, depends on
45.
The number of vehicles moving in a specified direction on a roadway that pass a given point during specified unit of time, is called
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers