1.
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is
0.90 m3
0.94 m3
0.98 m3
1.00 m3
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
25 comments Page 3 of 3.

Khld said:   4 years ago
. 88 m^3 is the right answer.

MJM Gcek said:   4 years ago
The correct answer is 0.88m3.

Nasir waheed said:   4 years ago
0.88 m^3 is the right answer.

MJM Gcek said:   4 years ago
The answer is 0.88m^3.
(1)

Khld said:   4 years ago
164.5 is assumed, how?