Civil Engineering - Estimating and Costing - Discussion
Discussion Forum : Estimating and Costing - Section 2 (Q.No. 1)
1.
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is
Discussion:
25 comments Page 2 of 3.
V C SAWATHKAR said:
4 years ago
For 4cm thick flooring constant of rate analysis is 6.6.
6.6/(1+2+4) = 0.94285,
for 2.5cm thick flooring 4.125.
6.6/(1+2+4) = 0.94285,
for 2.5cm thick flooring 4.125.
Sonu said:
1 decade ago
Hi.
Please tell me, How to calculate the Qty of cement 0.940 m^3 ?
Please tell me, How to calculate the Qty of cement 0.940 m^3 ?
Shiva khadka said:
4 years ago
100*0.04=4*1.54=6.16/7=0.88ans.
So, 0.90cum is the right answer.
So, 0.90cum is the right answer.
(4)
Deepak kumar said:
2 years ago
As per my knowledge, the Correct answer is 0.888 cum.
(4)
Sakshi said:
3 years ago
Qc = (1.65 * 100* 0.04)*1/7.
Qc = 0.94m^3.
Qc = 0.94m^3.
(9)
Ajay Sharma said:
4 years ago
(1/7) * 1.54 * 4 = 0.88m^3 = 0.9m^3.
Ratul boruah said:
1 decade ago
How to calculate the Qty of cement?
MILI said:
3 years ago
@Raj.
Very well analysis. Thanks.
Very well analysis. Thanks.
(5)
PRAMOD RAI said:
3 years ago
0.88 m^3 is the correct answer.
(4)
Rumit Raj said:
3 years ago
Yes, correct. Thanks everyone.
(2)