Civil Engineering - Estimating and Costing - Discussion

Discussion Forum : Estimating and Costing - Section 1 (Q.No. 3)
3.
A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved.
26, 000 m3
26, 500 m3
27, 000 m3
27, 500 m3
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
41 comments Page 5 of 5.

Hari said:   1 month ago
Anyone Please explain it with formula.


Post your comments here:

Your comments will be displayed after verification.