Civil Engineering - Estimating and Costing - Discussion

Discussion Forum : Estimating and Costing - Section 1 (Q.No. 3)
3.
A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved.
26, 000 m3
26, 500 m3
27, 000 m3
27, 500 m3
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
41 comments Page 3 of 5.

Ranjan said:   7 years ago
How to calculate this? Explain in detail.

Salini said:   7 years ago
How to calculate this?

Hari said:   2 months ago
Anyone Please explain it with formula.

Durga said:   1 decade ago
How to calculated this?

Nila said:   1 decade ago
Is there any formula for this to calculate?

Prince said:   1 decade ago
Can anybody please tell how it is calculated ?

RAMESH said:   1 decade ago
Determined. The area of circle and depth and height multiply them got it means volume.

Ritu said:   1 decade ago
It may theta equal length/radius for a curve than length equal radius multiply angle theta than put formula 2.L.D. root of s. Here s equal 2.

Naveen said:   1 decade ago
Please tell the formula.

Mayuri said:   1 decade ago
How to calculate?


Post your comments here:

Your comments will be displayed after verification.