Civil Engineering - Estimating and Costing - Discussion
Discussion Forum : Estimating and Costing - Section 2 (Q.No. 37)
37.
The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is


Discussion:
13 comments Page 2 of 2.
Notin said:
8 years ago
Out of the quantities of various item earthwork in an excavation in the foundation, PCC works in the foundation with 1:4:8 proportion, bricks work 1:6 foundation and plinth, damp proof course 2.5 cm thick, plastering 1.6 both side of wall and plinth wall.
Sitaam said:
8 years ago
5*.5 *.4 = 1 * 450 = 450 answer.
RanguwaL said:
7 years ago
The dimensions in figure are in which unit? mm, m, cm? Please tell me.