Civil Engineering - Estimating and Costing - Discussion
Discussion Forum : Estimating and Costing - Section 1 (Q.No. 2)
2.
The expected out turn of 2.5 cm cement concrete floor per manson per day
Discussion:
48 comments Page 5 of 5.
Sanu chadar said:
5 years ago
Thanks all.
Akshay rana said:
5 years ago
For 2.5cm flooring, it's 12.50sqm as per the book.
(1)
Er Taba Amith said:
4 years ago
Any reference? where it comes from? Please give details.
(1)
Gowri said:
4 years ago
Option 3 : 7.5 square meter.
The expected outturn of 2.5 cm concrete floor is 7.50 square meters per mason.
The expected outturn for lime concrete in foundation or floor is 8.50 cubic meters per mason.
The expected out turn of earthwork in an excavation in ordinary soil is 3 cubic meters per mason.
Particulars of Item:
Expected
out-turn (sq. meter).
12 mm Plastering with cement or lime mortar is 8.0.
Pointing with cement or lime mortar is 10.0.
2.5 cm C.C. floor is 7.50.
Sawing hardwood is 4.00.
Sawing of softwood is 6.00.
The expected outturn of 2.5 cm concrete floor is 7.50 square meters per mason.
The expected outturn for lime concrete in foundation or floor is 8.50 cubic meters per mason.
The expected out turn of earthwork in an excavation in ordinary soil is 3 cubic meters per mason.
Particulars of Item:
Expected
out-turn (sq. meter).
12 mm Plastering with cement or lime mortar is 8.0.
Pointing with cement or lime mortar is 10.0.
2.5 cm C.C. floor is 7.50.
Sawing hardwood is 4.00.
Sawing of softwood is 6.00.
(16)
Dhadhal purvi said:
3 years ago
18.75/0.25 = 7.5.
(2)
PARASWAR said:
3 months ago
5sqm is the correct answer as per CPWD NORMS.
Shivam Kushawaha said:
2 months ago
7.5 is the right answer.
Deba sarki said:
2 weeks ago
Thanks everyone for giving explanations.