Civil Engineering - Estimating and Costing

Exercise : Estimating and Costing - Section 1
11.
Pick up the correct statement in case of water supply.
Pipes laid in trenches and pipes fixed to walls are measured separately
Cutting through walls and floors are included with the item
Pipes are classified according to their sizes and quality
In laying pipes, the method of jointing and fixing is specifically specified
All the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

12.
In case of laying gullies, siphons, intercepting traps, the cost includes
Setting and laying
Bed concreting
Connection to drains
All of these.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

13.
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and
breadth of the wall
half breadth of wall on each side
one fourth breadth of wall on each side
None of these.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

14.
The height of the sink of wash basin above floor level is kept
60 cm
70 cm
75 cm to 80 cm
80 cm
Answer: Option
Explanation:
No answer description is available. Let's discuss.

15.
While preparing a detailed estimate
Dimension should be measured correct to 0.01 m
Area should be measured correct to 0.01 sqm
Volume should be measured correct to O.Olcum
All the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.