Discussion Forum : Construction Management - Section 2 (Q.No. 17)
17.
PERT analysis is based on
optimistic time
pessimistic time
most likely time
all the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
1 comments Page 1 of 1.

Alok g said:   11 months ago
Pert is based on pessimistic time.