Various activities of a project, are shown on bar charts by
Discussion:
16 comments Page 2 of 2.
Deeptikant sharma said:
5 years ago
A vertical line shows activities and horizontal line shows time duration.
Umair Ahmad said:
4 years ago
First time developed by Henry Gantt around 1900 and is used to deal with complex activities.
The bar chart consists of two coordinates, the horizontal represents the time elapsed and the vertical represents the job or activities performed.
The bar chart consists of two coordinates, the horizontal represents the time elapsed and the vertical represents the job or activities performed.
(3)
Muhammad Ali Khetran said:
3 years ago
Yes, B is the correct answer, I agreed.
(3)
WASEEM SANGI said:
3 years ago
In Bar charts, time is represented in x-direction & the y-axis represents the activities.
So, the correct answer will be A.
So, the correct answer will be A.
(7)
Akram said:
1 year ago
Here in the options, it is asking about the lines, not the axis.
So, the Horizontal lines are used to show the activities.
So, the Horizontal lines are used to show the activities.
(1)
Akram said:
1 year ago
Here it is not asking about the axis i.e Vertical or horizontal axis.
The answer is B, because horizontal lines are used in charts to show the activities.
The answer is B, because horizontal lines are used in charts to show the activities.