For quality control of Portland cement, the test essentially done is
setting time
soundness
tensile strength
consistency
all the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
67 comments Page 2 of 7.

Pankaj said:   8 years ago
What is the Initial setting time of concrete?
(2)

Sushree said:   8 years ago
How to test soundness of cement?
(2)

Shashikant Suman said:   8 years ago
All the above test should be done for quality control. Because the setting time, soundness is very important.

Mohammed Y Ahmed said:   8 years ago
Here, psi means pounds per sq inch.

Kondareddy said:   8 years ago
What is 1500psi?

Tadesse gobezayehu said:   8 years ago
For Concrete, Tensile Strength is not much important.

Shamsher thakur said:   9 years ago
Thank you all for the explanation.

Vishnu said:   9 years ago
At the time of bleeding, water comes out of the surface of concrete being lowest specific gravity among all other ingredients.

Ademola said:   9 years ago
What is bleeding in concrete?

Gowtham vijay kanuri said:   9 years ago
To prepare concrete with portland cement we must know the characteristic compressive strength within the span of 7days and 28 day curing.