23.
If the effective working time is 7 hours and per batch time of concrete is 3 minutes, the output of a concrete mixer of 150 litre capacity, is
Discussion:
20 comments Page 2 of 2.
Ajay said:
1 decade ago
Can any solve this problem how this answer come?
Sumit gawande said:
7 years ago
3*150 = 450.
7*60 = 420.
420*450 = 189000 l.
7*60 = 420.
420*450 = 189000 l.
Rajiv said:
7 years ago
@All.
It is;
54x7/3=126,
Then 126x150 =18900.
It is;
54x7/3=126,
Then 126x150 =18900.
TUHIN said:
6 years ago
100% efficiency can't possible for a machine.
Samuel said:
1 decade ago
Effective working time = 420 minutes (7 hours).
Batching time = 3 minutes.
No : of batching = 420/3 = 140.
Output concrete for 1 batching = 150 liters.
For 140 batching = 150*140 = 21000 liters. (This is the actual value).
But I think here they consider the efficiency of the batch plant as 90%.
= 21000*90/100 = 18900 liters.
Batching time = 3 minutes.
No : of batching = 420/3 = 140.
Output concrete for 1 batching = 150 liters.
For 140 batching = 150*140 = 21000 liters. (This is the actual value).
But I think here they consider the efficiency of the batch plant as 90%.
= 21000*90/100 = 18900 liters.
Jay Shah said:
1 decade ago
There is any clues for assuming the efficiency = 90%?
Amit said:
1 decade ago
Effective working time= 7 hours = 7*60 = 420 minute.
Per batch time = 3 minute.
Number of mixing batch = 420/3 = 140.
Output concrete of per batch = 150 litre.
Output concrete 140 batch = 140*150 = 21000 litre.
Assuming the efficiency = 90%.
21000* 0.9 = 18900.
Per batch time = 3 minute.
Number of mixing batch = 420/3 = 140.
Output concrete of per batch = 150 litre.
Output concrete 140 batch = 140*150 = 21000 litre.
Assuming the efficiency = 90%.
21000* 0.9 = 18900.
MOHD PARVEZ said:
1 decade ago
Effective working time= 7 hours = 7*60 = 420 minute.
Per batch time = 3 minute.
Number of mixing batch = 420/3 = 140.
Output concrete of per batch = 150 litre.
Output concrete 140 batch = 140*150 = 21000 litre.
Per batch time = 3 minute.
Number of mixing batch = 420/3 = 140.
Output concrete of per batch = 150 litre.
Output concrete 140 batch = 140*150 = 21000 litre.
Dorna said:
4 years ago
The minimum mixing time is 2 minutes and why the value 3 is min batching is mandatory? Please explain me.
Bina said:
1 decade ago
How do this answer came. Please explain ?
Post your comments here:
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers