37.
The internal dimensions of a ware house are 15 m x 5.6 m, and the maximum height of piles is 2.70 m, the maximum number of bags to be stored in two piles, are
1500 bags
2000 bags
2500 bags
3000 bags
4000 bags
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
45 comments Page 4 of 5.

Sabin said:   7 years ago
Give the explanation of the correct answer, please.

Deepu Maury said:   7 years ago
Area-(15-0.3) *(5.6-0.4) =77.91.
1.2m space leaves between two piles 1.2 * 14.7 = 17.69.

Redution 77.91-17.91 = 60.27.
Volume-60. 27 * 2.7 = 162.72 ÷ 054 = 3013.5bag.

Tanveer said:   7 years ago
Then, what is the answer? Please explain it correctly.

Manesh PB said:   7 years ago
@All.

I don't think the above answers are correct because according to the guidelines for cement warehouses.

1. It is advisable to never stack more than 10 cement bags over each other as this will lead to lumping under pressure.
2. Should provide 600mm space away from the wall.
3. The width of the stack shall not be more than 4 bag width or 3m
4. A passage of 600mm should provide in between each stack for easy access and inspection.

Sanjay said:   8 years ago
Answer is 4200 bags. It's a perfect answer.

Sai said:   8 years ago
7 bags for 1 cum concrete.

15 * 5.6 * 2.7 = 226.8 cum.
226.8 * 7 = 1587.6 cum for 1 pile.

For 2 piles 2 * 1587.6 = 3175.2 bags.

Monu kumar said:   8 years ago
Length = 15-0.6 = 14.4m.
Breadth=5.6-0.6-0.8=4.2m.
0.8 less for gap b/w two piles.
Area=14.4*4.2=60.48sq.m.
No.of bag in one layer=60.48/0.3=201.6bags.
0.3 area of one bag cement.
2.7/0.18 = 15.
0.18 is the height of one bag cement.
Then, 201.6 * 15=3024 bags -> 3000 bags.

Sufazo said:   8 years ago
Hi guys, you have a room dimension, but nobody doing deduction properly, between the piles diff should be 1.2 m and 0.30 m from both side wall, but in width. Both side wall deduction. After the deduction, you have the answer, approximately 3600.

Chirag bhawsar said:   9 years ago
Density of cement is 0.035 cum.
And height of pile means the depth of ware house.
Length and breadth of the ware house is given,

For the volume of the ware house (length x breadth x height).
= 15 x 5.6 x 2.7.
= 226.8 cum.

Total quantity of cement = 226.8/0.035.
= 6480cum.
In two row it contains = 3240cum cement total.
So 3000 is suitable option for that because it can contain more than 2000 and less than 4000.

Rashid Ali said:   9 years ago
Floor area of the warehouse for 2 number of piles will be:
length = 15 - 0.6 = 14.4.
And breath b = 5.6 - 0.6 - 1 = 4 m.

Because the standard of the gap between two piles is 1 m so area = 14.4 * 4 = 57.6 sqm. And the area of one bag cement 0.3 sqm. So the number of the bag in one layer = 57.6/0.3 = 192 bags and for 2.7 m height mean 15 layers of bags.

So the total number of bags will be 192 * 15 = 2880.