Rajesh thakur said:   9 years ago
@All.

This Question had been asked SSC(JE) and in that key the answer is 28.

Please tell me, which is the correct answer.

Nasim said:   2 years ago
The normal range for the amount of water used to mix each 50 kg bag of cement is between 20 liters and 30 liters.

Rupesh Hunde said:   10 years ago
Water requires= (45% of cement+25% of filling gel pores).

Water requires= (45%*50 + 25%*50) =35 kg/litre.

Sami ullah said:   7 years ago
For a general purpose, w/c ratio is .45.

So, water required for 1 bag of cement (=50kg) is 22.5 ltrs.

Mohit kumar said:   6 years ago
In the process of hydration of OPC. What is the water requirement to complete the chemical reaction ?
(1)

Er. Rakesh Siwach said:   10 years ago
Maximum W/C Ratio = 0.7.

Minimum W/C Ratio = 0.2.

The result for maximum w/c ratio is 35 kg/bag.

Aesthetic said:   7 years ago
Simple, the unit should be in litres not kg so the answer is correct, only it should be in litres.

Sandip said:   1 decade ago
I am confused with question, water required per bag of cement? for what, is it concrete or mortar.

Hardik parmar said:   1 decade ago
Could anyone explain about this because min w/c ratio is 0.22 required with reaction of cement.

Srikumar said:   5 years ago
Minimum water cement ratio is 0.45.
with that 50kg(1bag) x 0.45= 22.5 is the correct answer.
(6)