Civil Engineering - Building Construction - Discussion
Discussion Forum : Building Construction - Section 1 (Q.No. 3)
3.
Dado is usually provided in
Discussion:
43 comments Page 2 of 5.
SUMIT said:
9 years ago
The tile in between bottom of wall and flooring is called as:
a) Dado
b) Skirting
c) Both a & b
d) None
Please give the answer.
a) Dado
b) Skirting
c) Both a & b
d) None
Please give the answer.
(1)
Mohan Kumar K U said:
7 years ago
It's a small track to avoid seepage and or holds bathrooms Self's to keep washings.
Mainly it acts like a water seepage controller.
Mainly it acts like a water seepage controller.
Shubham Umak said:
9 years ago
If the tiles are placed vertically in between window sill and floor of bathroom and w.c. And in kitchen then it is term as Dado.
Niraj ku yadav said:
1 decade ago
Dado means tiles which is provided in surface and lower area of wall prevention wet and disturbance than wall life long time.
Zia ul hassan khan said:
1 decade ago
Dado is the finishing which makes more than border/skirting. Skirting usually 4" height while dado is 6 to 7' high.
Afzzal said:
1 decade ago
Dado is the finishing which makes more than border/skirting. Skirting usually 4" height while dado is 6 to 7' high.
Jitender singh said:
1 decade ago
The lower part of a wall in a room, especially when it is decorated differently from the upper part of the wall.
Dhiti said:
1 decade ago
Dado is usually provided to prevent soaking of water in the walls of bathroom which are prone to water everyday.
Laxmi said:
1 decade ago
Dado usually provides in bathrooms because to prevent water seepage while baths and its height 6-7'.
Gulrej said:
9 years ago
Dado used for prevent of water seepage and good appears because size of dado is rectangular shape.
Post your comments here:
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers