Discussion Forum : Time and Work - General Questions (Q.No. 4)
4.
A is thrice as good as workman as B and therefore is able to finish a job in 60 days less than B. Working together, they can do it in:
20 days
22 1 days
2
25 days
30 days
Answer: Option
Explanation:

Ratio of times taken by A and B = 1 : 3.

The time difference is (3 - 1) 2 days while B take 3 days and A takes 1 day.

If difference of time is 2 days, B takes 3 days.

If difference of time is 60 days, B takes 3 x 60 = 90 days.
2

So, A takes 30 days to do the work.

A's 1 day's work = 1
30

B's 1 day's work = 1
90

(A + B)'s 1 day's work = 1 + 1 = 4 = 2
30 90 90 45

A and B together can do the work in 45 = 22 1 days.
2 2

Discussion:
281 comments Page 21 of 29.

Thirupathi Malavath said:   1 decade ago
Simple method:

Say B completes the work in 'x' days.

Then A will take (x-60) days to finish the work.

Since A is thrice as good as B, 3A=B.

Therefore, 3 (x-60) =x, x=90.

B's 1 day work=1/90, A's 1 day work=1/30.

(A+B) 's 1 day work= (1/90+ 1/30) =2/45.

Therefore, both can finish the work in 45/2 days i.e., 22 1/2.

PARASHAR said:   1 decade ago
Simple yaar.

>A is thrice as good as workman as B and therefore is able to finish a job in 60 days=IF B TAKE 90 DAYS THEN A WILL TAKE 30 (60 DAYS LESS).

>1/30 (PLUS) 1/60=4/90==>90/4==>22. 5 SIMPLE.

Vinod Anand said:   1 decade ago
If A is thrice as good as workman B,
Than A=3B ----(1) or B=A/3 --------(2).

If A is finish a job in 60 days less than B.
Than A = B-60.

Put the value of B from Eq.(2).

A = A/3 -60
3A = A-180
2A = 180
than A = 90 Days.

Same Put the value of A in Eq.(2).
B=90/3 = 30 Days.

So Working together (A+B) = 1/90 + 1/30.

A+B = 2/45.
or A+B =45/2 = 22.5 or 22 1/2.

Answer.22 1/2 Days.

Sridhar said:   1 decade ago
Simple way:

A and B ratio 1:3.

Since A finishes 60 days lesser than be A takes 90 days and B takes 30 days.

So per day calculation (1/90+1/30) = 22.5 days.

Praveen said:   1 decade ago
@All.

Please refer to Sheetal's response as given below. Its the best and easiest way to solve such questions.

PS:Thanks sheetal.

"A is K times as good a worker as B & takes X days less than B to finish the work. Then the amount of time required by A & B working together is K * X / K'S SQUARE - 1.

SO IN QUESTION K IS 3. X IS 60. SO PUTTING THE VALUES IN ABOVE MENTIONED FORMULA.

K * X / K'S SQUARE - 1
=3 * 60 / 9 - 1
=3 * 60 / 8
=180 / 8
=22.5 DAYS.

AS MENTIONED OPTION B.

Monika said:   1 decade ago
We have a direct formula for these kind of questions .. i.e.,

Work done together is given by = (m*d)/(m^2 - 1),

Where d is no of days taken by B and m is no of time A is faster than B,
Therefore = (3*60)/(3^2-1) = 22.5.

Pankaj said:   1 decade ago
Let A takes x days to do the work alone
Therefore days taken by b is (x+60).

Now A is 3 times faster than B
So no.of days taken by A will be 3 times less than B.
So
3*x=(x+60)
2x=60
x=30 days //work done by A
Work done by B=30+60=90 days.

Now we can find work done together
1/30 +1/90 to get the answer.

Kavya said:   1 decade ago
A is twice as good a workmen as B and together they can finish a piece of work in 18days. In how many days will A alone finish the work?

Can we solve the above problem using the formula k*x/k^2-1.

Keerthi said:   1 decade ago
So by the explanation above we have to take in the ratio 1:3.

Ashutosh said:   1 decade ago
Formula-->nx- (n+1) /nx.
4x-4x/3=60 so x=45/2.


Post your comments here: