Mechanical Engineering - Industrial Engineering and Production Management - Discussion

Discussion Forum : Industrial Engineering and Production Management - Section 2 (Q.No. 49)
49.
In value engineering, important consideration is given to
customer satisfaction
function concept
profit maximisation
cost reduction
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
4 comments Page 1 of 1.

Nvk said:   12 months ago
The correct answer is: function.

In Value Engineering (VE), the most important consideration is given to the function of a product, process, or system. VE is a methodology that focuses on analyzing and improving the functionality of a product or process, to achieve the required function at the lowest possible cost.

The primary considerations in VE are:

- Function: What does the product or process do?
- Cost: What is the cost of achieving the function?
- Value: What is the value of the function to the customer?

While customer satisfaction, profit maximization, and cost reduction are important considerations in business, they are not the primary focus of Value Engineering.

- Customer satisfaction is important, but it is a secondary consideration to function.
- Profit maximization is a business goal, but it is not the primary focus of VE.
- Cost reduction is a common outcome of VE, but it is not the primary consideration.

=> Value Engineering is a powerful methodology for improving the efficiency and effectiveness of products, processes, and systems, and is widely used in various industries.

Vinay BEL said:   5 years ago
The aim of Value Analysis is to generate promising ideas, to;

(i) Simplify the product..
(ii) Use (new) cheaper and better materials.
(iii) Modify and improve product design.
(iv) Use efficient process.
(v) Reduce the product cost.
(vi) Increase the utility of the product by economical means, and
(vii) Save money or to increase the profits.

Guru said:   6 years ago
Value engineering = function concept/cost reduction.
(1)

Mak said:   7 years ago
Answer is B-function concept.

Post your comments here:

Your comments will be displayed after verification.